LADY KATHRYN V
About LADY KATHRYN V
LADY KATHRYN V was the final 60m Luerssen to be built at their Bardenfleth facility and delivered to her Owner in 2011.
SEMarine was appointed as Owner’s Representative and Technical Consultant for the duration of the project.
The specification was evolved. Basic and detailed design developed. Construction quality assured through Periodic survey. Performance verified at tests and trials.
Service Supplied
- Owner’s Representative
- Technical Consultant
- Specification Development
- General Arrangement Evolution
- Basic Design Development
- Detailed Design Development
- Construction Quality Control
- Tender Boats
- Performance verification / Acceptance